Size the power, storage, and compute for a community resilience &
knowledge node in a 20 ft container — and see an honest capex range built from
verified 2025–26 component prices. Pick a scenario, adjust the loads, and every
number below recomputes.
Inputs
Drives device-charging bays (1 bay of 8 × 12 W devices per 25 people).
Days the battery alone must carry the full daily load.
Loads
Active cooling (auto: workstation-class compute)
Component pricing basis
Sets PV module $/W and Starlink pricing; other items adjust for shipping.
PV array
Battery (LiFePO4)
Hybrid inverter
Compute tier
Estimated hardware capex
Itemized range · excludes land, permitting, staffing, and month-37 operations
Daily load vs. solar generation
LoadPV output
What stays on during a 5-day outage
Assumes 50% of normal solar yield during the outage (storm sky),
80% usable battery depth, loads kept in the priority order shown. Reduced = shorter
daily hours; shed = switched off to protect higher priorities.
Sources — the numbers behind this tool
PV modules $0.08–0.10/W FOB China (TOPCon) — pv-magazine, Mar 2025
(pv-magazine.com);
$0.26–0.28/W US DDP, tariffed — pv-magazine USA, Mar 2025
(pv-magazine-usa.com).
LiFePO4 storage, branded retail: $450–600/kWh usable — HBOWA/pretapower 2025
(pretapower.com).
48 V server-rack class (EG4 etc.) is materially cheaper, vendor-direct.
Hybrid all-in-one inverter, 8–12 kW class: EG4 runs ~20–30% below Sol-Ark/Victron; integrated MPPT
saves $700–2,000 in components (solartechonline.com,
Signature Solar).
Unit price used here is an estimate.
Edge compute power: Jetson Orin Nano 8–12 W typical (25–28 W peak); Orin NX 14–20 W; AGX Orin
40–60 W typical, 75 W peak (edgeaistack.ai,
NVIDIA).
RTX-workstation-class node ~300–600 W sustained — general spec knowledge, unverified.
Price anchors: Africa GreenTec Solartainer ~€150,000 for a ~50 kWp village unit
(deutschland.de);
BoxPower ~16 kW containerized microgrid $80–90k installed
(HOMER Microgrid News).
Long Island ≈ 4.0 peak sun-hours/day (annual average; winter lower); East Africa ≈ 5.5 —
preset values, typical solar-resource figures, site-specific study required.
Items marked est. (BOS, container fit-out, shipping/install, inverter unit price,
compute hardware, load wattages) are demonstration estimates, not dossier-verified prices.
Prototype — demonstration estimates for discussion, not engineering design.
Built in response to Magnifica Humanitas ¶67.