St. Brigid's Parish Resilience Node

Westbury, NY · Parish Hall & Community Container Storm Mode — Grid Down Demonstration data
Day 3 of outage · Tropical storm, landfall Tuesday · Utility estimate: restoration in 3–5 days for this area
Wed 11:20 AM

Power Budget

40 kWh battery · 8.2 kW rooftop + container solar Sky: heavy cloud
62% battery
0reserve 20%50100
Stored energy24.8 kWh
Current draw720 W
Solar in today6.4 kWh (clear-sky est. 31)

Projected hours to 20% reserve

Single measure, current loads. Steward reviews at 8 AM / 8 PM.

Solar input today — actual vs clear-sky

Actual (under cloud) Clear-sky estimate

Load allocation — priority ladder

    Comfort circuit shed by steward decision Tue 9:40 PM to protect medicine refrigeration overnight.

    Neighbor Check-in Board

    Seniors & medically-dependent · parish list + CCLI referrals 3 need a visit
    Needs-visit queue: — assign a volunteer below. A person checks in by phone, at the door, or a neighbor vouches; the board only remembers, people do the visiting.
    NeighborDepends onLast contactStatusVolunteer

    Charging & WiFi

    Fair use: 45 min per household while a queue exists 6 of 8 bays in use

    Waiting (3 households)

    #HouseholdJoined
    37WiFi devices
    FairNetwork health
    OfflineUplink (cell down)
    140Meals served today

    Notices Board / Tablón de avisos

    Read aloud after each meal service · Se lee en voz alta después de cada comida

    Event Log

    Local only — nothing leaves the parish